Commercial Above-Ground Storm Shelters For Tennessee

Above-ground commercial tornado shelters engineered to protect 25-200+ employees with adaptable configurations for any Tennessee business. FEMA P-361 and ICC-500 compliant installations that scale from single units to multi-shelter complexes.
Quonset Tornado Shelter

Permanent Quonset Commercial Shelters

Steel-reinforced concrete foundation installations for schools, offices, manufacturing facilities, and permanent business locations across Tennessee.

Standard Quonset Unit

25-80 people capacity
Dimensions: 10′ wide x custom length
Construction: Quarter-inch cold rolled steel

Technical Specifications:
  • 250+ MPH wind rating (EF-5 protection)
  • 50 AMP electrical panel with battery backup
  • Triple-locking single-lever door latch
  • Forced ventilation fan with vent shrouds
  • ADA-compliant 3′ x 6’8″ door access

Side-by-Side Configuration

50-160+ people capacity
Dimensions: Dual 10′ wide units with connecting walkway
Construction: Quarter-inch cold rolled steel with unified connector

Technical Specifications:
  • Two independent Quonset units with walkway connector
  • Dual electrical systems for redundancy
  • Multiple entry/exit points for emergency egress
  • Unified occupancy management during emergencies
  • Expandable for future capacity increases

Scalable Protection for Any Tennessee Business

Modular design allows future additions as your business grows. Additional units connect to existing installations without major reconstruction.
/
Small Business (25-50 employees)

Single Quonset unit with room to grow. Comes with standard electrical and ventilation systems.

+
Medium Facilities (50-150 employees)

Multiple Quonsets for campus-wide coverage; custom placement planning.

1
Large Operations (150+ employees)
Multiple Quonsets for campus-wide coverage; custom placement planning.
Mobile Workforce

Transitional shelters move with you; no permanent foundation needed.

Storm Shelter Interior

Installation & Compliance

Wolcott manages all permit applications, engineering submittals, and inspection scheduling. Our crews coordinate with your operations to minimize business interruption during installation.

Fondation Requirements

Permanent installations require steel-reinforced concrete foundations engineered for local soil conditions.

Transitional systems use ballast foundations that adapt to various site conditions without permanent excavation.

Installation Timeline:

Permanent shelters: 4-6 weeks from permit approval to operational

Transitional shelters: 1-2 weeks from site preparation to deployment

Multi-unit projects: Phased installation minimizes business disruption

FEMA P-361 & ICC-500 Compliance

  • Debris impact tested at Texas Tech Wind Institute
  • National Storm Shelter Association (NSSA) certified
  • Engineered and sealed by licensed structural engineers
  • Meets all Tennessee commercial building code requirements
Wolcott Storm Shelters Logo

Protect Your Tennessee Business Operations

Commercial tornado protection requires engineering that adapts to your specific facility, workforce size, and operational requirements. Our commercial storm shelter solutions provide immediate EF-5 protection with installation flexibility that works for any Tennessee business.

Wolcott Storm Shelters Full Logo
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.